Crew time and labor-cost estimating worksheet

Use one defined task and a comparable completed job. Label every rate as per worker hour or per crew hour. This worksheet records your calculations; it is not an automatic calculator.

Click each box to enter notes. Save an edited HTML copy to keep your entries, or print / save a PDF. This file does not transmit answers or store them automatically. Keep the blank master for reuse.

Fictional US-dollar costs, quantities, and production rates prepared October 30, 2026. These are teaching assumptions, not trade benchmarks, wage guidance, or current local prices.

1. Task, measured quantity, unit, included work, and exclusions
2. Comparable job record, observation date, and important site conditions
3. Crew roles, headcount, and loaded employer cost for each role
4. Rate basis: which job hours are included and which costs are already allocated
5. Observed installation hours by person and total installation labor hours
6. Observed setup and cleanup hours, total labor hours, and crew hours
7. Output per installation labor hour and total observed labor cost
8. Next-job quantity, installation hours, fixed hours, and cost by role
9. Slower-production scenario, supporting reason, and cost difference
10. Schedule assumptions, review owner, and actual-versus-estimate follow-up